Stand alone Villa 1029

Client Info

  • Client Name: Palm Hills
  • Project Type: Stand Alone
  • Project Location: New Cairo
  • Supervisor Engineer: Eng Ehab Hakam

Stand Alone Villa 1029 – Palm Hills, New Cairo

The project received great appreciation from the client and was delivered on the agreed deadline, which demonstrates the strong capability of Constrade Design to execute large-scale projects in record time.

Engineering Supervision:
Eng. Ehab Hakam


1. Architectural Modifications

After completing the architectural modification drawings according to the client’s requirements, we carried out demolition works and added some masonry elements.

Bricks used:
Cement bricks, size 25 × 12 × 6 cm


2. Plumbing

Materials used in rough-ins / first-fix works:

  • Aquatherm water supply pipes
  • Hamza drainage pipes
  • Concealed tanks
  • Grohe concealed mixers for showers
  • Grohe shower jets

Materials used in finishing works:

  • Duravit toilet bases
  • Spanish imported porcelain basins matching the wall finishes
  • Grohe mixers
  • Grohe shower sets and hand showers

3. Electrical Works

Execution of first-fix and finishing works for electrical systems, including:

Power systems:

  • Lighting and power boxes
  • Earthing
  • Power supply for air conditioners and water heaters
  • Deferrers / shutters
  • Sensors
  • Elevator
  • Piano staircase lighting
  • Gypsum board lighting, etc.

Low-current systems:

  • Intercom
  • Sound system
  • Network system
  • Satellite dish
  • Video intercom, etc.

All works were carried out inside and outside the villa according to the execution drawings and in compliance with industry standards.

Materials used in first-fix works:

  • Swedish wires
  • Magic conduits and boxes by Mostafa Mahmoud
  • ABB electrical panels

Materials used in finishing works:

  • Schneider switches
  • Lighting units (LEDs, chandeliers, spotlights, tracks, etc.)
    from approved suppliers such as:
  • Crystal Asfour
  • Moharram & Karima
  • Safa Light

4. Plastering

Scratch coat and plastering works for the villa’s interior walls, including:

  • Aligning and squaring
  • Screeds and guides
  • Treatment of openings and corners
  • Fisibico mesh and fiberglass mesh
  • Everything necessary to complete the work according to industry standards and the supervising engineer’s instructions

5. Air Conditioning

Execution of first-fix and preparation works using:

  • South African copper pipes
  • 9 mm Armaflex insulation
  • First-grade plastic insulation
  • 5 × 8 control cable
  • Flexible piping for floors and outdoor areas

For 11 concealed hot/cold inverter air conditioners, Carrier Media type.

Exhaust and ventilation fans:

  • Kitchen fans: 8 inches
  • Bathroom fans: 4 inches
  • Sheet-metal ducts for ventilation fans

Supply and installation of approved Kandil 275 sheet-metal ducts with insulation, and supply and installation of 28 grilles.


6. Painting

Supply and execution of painting works for interior walls and ceilings.

Preparation stage:

  • Sanding and sealer coat
  • Sili Coat Skip or GLC on plastic paint
  • 1 undercoat sealer on plastic paint
  • 1 plastic putty coat

Finishing stage:

  • Supply and application of 2 finishing coats of Jotun Flomastic, 7% matte

Facade paint:

  • Acrylic paint finish by Jotun

7. Gypsum Board

Supply and installation of Knauf white gypsum board for the entire unit, except:

  • Bathrooms: green gypsum board
  • Kitchen: red gypsum board

With 0.4 mm metal frame, protection corners, and gypsum board joint compound included.


8. Marble

  • Black Brazilian Marble: staircase and staircase side cladding
  • Greek Calacatta: reception flooring and some wall cladding
  • Tiger Grey: roof and bar
  • Engineered Panda Marble: office room cladding
  • Onyx: kitchen and bathrooms
  • Black Brazilian – Spanish Gold – Greek Calacatta: entrance and corridors
  • Petra Grey: wall cladding
  • Tundra Grey – Trista Beige: garden

9. Ceramic & Porcelain

  • Imported Spanish porcelain 60 × 120 matte: for the roof
  • Imported Spanish porcelain 280 × 120: for bathrooms
  • Ceramic 40 × 40: beneath the HDF flooring in rooms

10. Alumetal

Maintenance of the aluminum works الموجود بالموقع, repainting them in the same color as the space internally and externally, in the color required by the compound, and installation of PLC mesh.


11. Elevator

Supply and installation of a hydraulic panoramic elevator, including:

  • Lifting unit
  • Pumping machine
  • Chassis
  • Cladding panels
  • Elevator guide rails
  • 10 mm securit cabin

12. Doors & Cladding (Wood Man)

  • Villa entrance door made of Azizi wood, painted with Jotun Woodshield
  • Internal doors made of Mouski veneered wood, finished with polyurethane paint
  • Cladding made of 18 mm Spanish MDF, heat-pressed with American oak veneer
  • Paint finish: Duko Cherwazيه (transliterated as stated)

13. Furnishing Works

Contracting with some of the largest furnishing companies in Egypt:

  • Maqam
  • Benzo
  • Cedar Curtains
  • Qabani

All furnishing items were executed according to the required dimensions, the design, and industry standards.


14. Car Parking Shades

Supply and installation of a pyramidal cantilever car parking shade, consisting of:

  • Imported Colaro fabric and HDPE covering
  • Fixed on a chassis mounted on columns with a height of 3 m
  • Finished with electrostatic paint and treated against weather conditions

15. Roof & Garden Awnings

  • 6 m Spanish GAVITO awning (4.5 m width × 4 m height)
  • 5 m Spanish GAVITO awning (5 m width × 3 m height)
  • 4 m Spanish GAVITO awning (3.5 m width × 3 m height)

16. Basalt

Supply and installation of black basalt 10 × 10 for the car parking area.


17. Crystal & Acrylic Works

Execution of:

  • TV screen frames in the rooms
  • Crystal works for the external fence
  • Crystal works for the seaside staircase
  • Acrylic fence works
  • Other crystal-related works

18. Swimming Pool & Fountains

Execution of swimming pool works including:

  • Excavation
  • Plain concrete footing
  • Reinforced base slab works
  • Tank body and masonry works
  • Waterproofing
  • Plastering
  • Ceramic and marble finishes
  • Mechanical and electrical works

All the way through to achieving the required final design, including the fountain works.


19. Garden Concrete Works

Execution of reinforced concrete casting (5 Ø 10 / m) for the garden flooring and walkways after compaction and level adjustment.


20. Specialized Items

  • Solar energy systems for water heaters and electricity generation
  • Heating system for warming floors and bathrooms
  • WPC flooring
  • Fiber optics in the ceiling
  • Fully integrated smart system
  • Shutters (executed by Euro Shutters)

21. Kitchens & Vanity Units

  • Kitchen and kitchenette: Matt Plus material
  • Vanity units: Gloss Max material

22. Securit Glass

Securit glass works including:

  • Shower cabins
  • Planter glass
  • Fence glass
  • Sliding systems
  • Folding systems
  • Skylight
  • (Other securit glass works)